Vectimber

Quality

Batch parameters defined before production starts

The control plan follows the component's function and drawing requirements rather than broad promises.

01

Incoming control

Verification of material and the data required to release an order.

02

In-process control

Checks of critical dimensions at points that matter to downstream operations.

03

Final control

Review of agreed features, quantities and batch preparation before dispatch.